Commercial  /  Office refurbishment

Ecom Digital

The Ecom Digital project consisted of a CAT-B refurbishment to an open plan commercial premises situated at 1 New York Street, Manchester. Works consisted of a design and build package, including installation of new partitioning including glazed doors, bespoke birch ply kitchen, bleacher seating, decoration, floor coverings and M&E package. A bespoke furniture package was included manufactured by our in-house workshop.

27 Oct 2020
No Comments
Admin

Ecom Digital

Ecom Digital The Ecom Digital project consisted of a CAT-B refurbishment to an open plan commercial premises situated at 1 New York Street, Manchester. Works consisted of a design and build package, including installation of new partitioning including glazed doors, bespoke birch ply kitchen, bleacher seating, decoration, floor coverings and M&E package. A bespoke furniture…
Read More
26 Oct 2020
No Comments
Admin

Lad Bible: London & Manchester

Lad Bible: Manchester & London The Lad Bible London project consisted of a CAT-B refurbishment to an open-plan commercial premises. Works consisted of a complete design and build package, including installation of new partitioning, bespoke joinery, break out and hospitality spaces, floor coverings and decorations.The Manchester project consisted of a CAT-B refurbishment to an open-plan…
Read More
25 Oct 2020
No Comments
Admin

Viddyoze

Viddyoze The Viddioze project consisted of a CAT B refurbishment to an open plan commercial premises situated at South Rings Buisness Park, Preston. Works consisted of a design and build package, including installation of new partitioning including glazing, bespoke joinery package, decoration including funky graffiti, floor coverings and full M&E package.  DATE September 19 DURATION…
Read More
17 Oct 2020
No Comments
Admin

Potter Rees Dolan

Potter Rees Dolan The project consisted of a CAT-B refurbishment to an open-plan commercial premises in Manchester City Centre. Works consisted of a design and build package, including installation of new glazed and solid partitioning systems, bespoke joinery, tea point, floor coverings, M&E installation and decoration. DATE August 19 DURATION 8 Weeks LOCATION Manchester Client…
Read More